The challenge

The Pools is a UK betting and gaming company. Its users work from home in the United States, so every Windows device in scope sat outside the office, without routine physical access for the IT team.

The Pools needed to move its devices from a Microsoft Entra hybrid joined state to a Microsoft Entra joined state. The team needed a predictable process that could be coordinated with home-based users, keep devices available and limit disruption to daily work.

A consistent remote workflow

Opsole Migrate provided one remote workflow for every device: preparing the device, keeping the user's existing Windows profile in place, transitioning the join state and completing post-migration activities.

Keeping the profile in place means users return to their existing Windows profile after the join-state change. Individual application settings should still be validated during a pilot, because this project does not cover every application configuration.

A structured five-day rollout

Structured pre-checks confirmed each device was ready before migration started, and progress monitoring tracked every device during the rollout. The team used a structured schedule and clear coordination with users to complete the rollout within five days.

Standard preparation and migration steps gave users a short, predictable migration window.

Results from the project

Every device in scope was addressed within five days, fully remote, without wiping or rebuilding.

These results are from The Pools project. They are not a performance guarantee for every environment; results depend on device readiness, network conditions and user coordination.

Lessons for future migration waves

The project produced four practical lessons for remote migrations:

  • Confirm stable power and internet connectivity before starting each remote migration.
  • Ask users not to sign in, restart or shut down the device while migration activities are running.
  • Give users a clear migration window and instructions before each scheduled migration.
  • Use monitoring and a documented recovery path so interrupted devices are handled consistently.

What this means for a migration project

A fully remote Microsoft Entra ID migration can be completed quickly when the process is controlled and repeatable: a standardized remote workflow, structured pre-checks and clear user coordination.

Organizations planning a similar transition can begin with a representative pilot to validate device readiness, the user experience and the communication users need before each migration.